105210-5240 ZEXEL 9 440 610 215 BOSCH SUPPLY PUMP 9440610215 1052105240 225601890a


 

Information supply pump

BOSCH 9 440 610 215 9440610215
ZEXEL 105210-5240 1052105240
HINO 225601890A 225601890a
105210-5240 SUPPLY PUMP
Rating:
31
Buy SUPPLY PUMP 105210-5240 zexel genuine, new aftermarket engine parts with delivery

Scheme ###:

1. [1] 152051-0020 PUMP HOUSING
5. [1] 152100-1120 PUMP PLUNGER
6. [1] 152102-1300 COMPRESSION SPRING
7. [1] 152105-1500 CAPSULE
8. [1] 029332-6030 GASKET
10. [1] 152111-2920 TAPPET
10/2. [1] 152112-1000 ROLLER
10/3. [1] 152113-0100 BEARING PIN
10/4. [2] 152114-0700 SLIDER
14. [2] 152115-0100 VALVE BODY
14. [2] 152115-0100 VALVE BODY
15. [2] 152116-0200 COILED SPRING
15. [2] 152116-0200 COILED SPRING
16. [1] 152117-0100 CAPSULE
18. [1] 029331-6030 GASKET
19. [1] 029631-6060 O-RING
20. [1] 152121-0200 LOCKING WASHER
25. [1] 152200-5420 HAND PRIMER
30. [1] 152300-7020 EYE BOLT
32. [1] 029731-4080 EYE BOLT
35. [2] 139514-0300 GASKET
36. [2] 139514-0300 GASKET

Cross reference number

Zexel num
Bosch num
Firm num
Name
105210-5240 
9 440 610 215 
NP-FP/KE-AD 
225601890A  HINO
SUPPLY PUMP
K 14GC FEED PUMP F/P
105210-5240 
9 440 610 215 
NP-FP/KE-AD 
S225601890  HINO
SUPPLY PUMP
A K 14GC FEED PUMP F/P
105210-5240 
9 440 610 215 
NP-FP/KE-AD 
S225601890A  HINO
SUPPLY PUMP
B K 14GC FEED PUMP F/P




Information:

General Information
Fig. 1-Engine Balancer ShaftsTwo types of balancer shafts are used (Fig. 1). They are mounted in the lower half of the cylinder block and each rotates in three pressure-lubricated replaceable bushings.The balancer shafts rotate in opposite directions to reduce engine vibration. Thrust of the balancer shafts is absorbed by thrust plates fastened to the front of the cylinder block.Removal
Remove fan belts, alternator, and fan.Remove oil pan.Disconnect oil cooler lines.Use a pulley puller to remove the crankshaft pulley.Remove the timing gear cover.Remove weights (2, Fig. 1), from the balancer shafts, if equipped.Remove oil pump gear and lower idler gear.Remove balancer shafts and identify as left and right.Remove balancer shaft gears (4, Fig. 1) by pressing them off.Remove balancer shaft thrust plates (3, Fig. 1).Repair
Fig. 2-Balancer Shaft Journals and Bushings MeasurementCheck oil clearance between balancer shaft journals (2, Fig. 2) and bushings (1). Maximum allowable clearance is 0.0058 in. (0.147 mm). If clearance is greater than this replace the bushings. If oil clearance is still too large, the balancer shaft must be replaced.
Fig. 3-Bushing RemovalThe first two bushings can be replaced using JD-249 Tool, Fig. 3.To remove the third bushing the flywheel housing must be removed, see Group 0433. IMPORTANT: Be sure that hole in each bushing lines up with upper oil lead hole in cylinder block.Press all bushings in from the front of the engine until flush with bushing bore chamfer in block using JD249 Tool.Inspect balancer shaft gears for worn, cracked or broken teeth.Installing Drive Gear
It may be necessary to place thrust plate on the shaft before installing the gear on the shaft depending on the type of thrust plate used.
Fig. 4-Replacing Balancer Shaft GearPosition balancer shaft drive gear on front of balancer shaft so slot in gear lines up with special key, and timing mark on front of gear faces away from balancer shaft. Press on gear using JD-247 Holding Tool to support shaft as shown in Fig. 4. Press gear on shaft with thrust plate in position. Clearance between thrust plate and gear should be 0.002 to 0.010 in. (0.05 to 0.25 mm).Installation
Apply a light film of oil to balancer journals and bushings.Secure thrust plates to front plate with hardware and tighten with 35 lb-ft (47 Nm) (5 kg-m).
Fig. 5-Timing Balancer ShaftInstall balancer shafts in their respective bores. Time balancer shafts as shown in Fig. 5 using JD254 Timing Tool.With a dial indicator check balancer shaft for end play of no more than 0.010 in. (0.25 mm) or no less than 0.002 in. (0.05 mm).
Fig. 6-Installing Balancer Shaft WeightsInstall balancer shaft weights, if used, being sure weights are installed on the machine surfaces of the shaft. Run the balancer shaft bolts through the weights and then through the shafts as shown in Fig. 6. Tighten special nuts to 43 lb-ft (58 N m) (6 kg-m).Replace oil pump gear and lower idler gear if necessary.
Fig. 7-Installing Timing Gear CoverInstall timing gear cover and crankshaft pulley (Fig. 7).Install engine oil cooler coolant hose.Install fan, alternator and fan

Have questions with 105210-5240?





Group cross 105210-5240 ZEXEL

Isuzu 

 
8970295120 
SUPPLY PUMP
9 440 610 138 
 
SUPPLY PUMP
9 440 610 374 
NP-FP/KE-ADS 
 
SUPPLY PUMP

Hino 

9 440 610 374 
NP-FP/KE-ADS 
225601920A 
SUPPLY PUMP
 
 

Hino 

9 440 610 375 
NP-FP/KE-AD 
225601930A 
SUPPLY PUMP
9 440 610 375 
NP-FP/KE-AD 
S225601930A 
SUPPLY PUMP
105210-5240  
9 440 610 215 
NP-FP/KE-AD 
225601890A 
SUPPLY PUMP
105210-5240  
9 440 610 215 
NP-FP/KE-AD 
S225601890 
SUPPLY PUMP
105210-5240  
9 440 610 215 
NP-FP/KE-AD 
S225601890A 
SUPPLY PUMP

Mitsubishi 

9 440 610 100 
NP-FP/KE-AS 
ME730303 
SUPPLY PUMP

Hino 

9 440 610 531 
NP-FP/KE-A 
225602370A 
SUPPLY PUMP
9 440 610 531 
NP-FP/KE-A 
S225602370A 
SUPPLY PUMP

Isuzu 

9 440 610 426 
8970686310 
SUPPLY PUMP
9 440 610 582 
NP-FP/KE-ADS 
 
SUPPLY PUMP
9 440 610 575 
 
SUPPLY PUMP
Back to top