Information plate
BOSCH
9 411 617 477
9411617477
ZEXEL
140254-4300
1402544300
ISEKI
62156290800
62156290800
Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
140254-4300
9 411 617 477
62156290800 ISEKI
PLATE
C 23XX PLATE PFR- parts PFR
C 23XX PLATE PFR- parts PFR
Information:
start by:a) remove valve cover 1. Use tool (A) to disconnect fuel line assemblies (1) from the fuel injection valves and valve base adapters. Remove fuel line assemblies (1). 2. Remove push rods (2) with tool (B). 3. Remove valve bridges (3) from the bridge dowels. 4. Remove the nuts that hold the fuel injection valve assemblies in place. Use tool (C) to remove fuel injection valves (4) from the direct injection adapters. 5. Use tool (D) to remove direct injection adapters (5) and gaskets from the cylinder heads.Install Direct Injection Adapters
1. Put 5P3931 Anti-Seize Compound on the threads of direct injection adapters (1).2. Put liquid soap on O-ring seal (3) and the adapter bore in the cylinder head. Install O-ring seal (3) on the adapter.3. Install adapter (1) and gasket (2) in the cylinder head. Use tool (A) to tighten the adapter to a torque of 150 10 lb.ft. (205 14 N m). 4. Put a small amount of clean engine oil on the bridge dowels. Install valve bridges (4). 5. Put a small amount of diesel fuel in the direct injection adapter bore. Install fuel injection valves (5) with tool (B). Tighten the nuts that hold the injection valves in place to a torque of 55 5 lb.ft. (75 7 N m). 6. Install push rods (9) with tool (C).7. Put a small amount of diesel fuel on O-ring seal (6) and install fuel line assemblies (8). Tighten fuel line nuts (7) to a torque of 30 5 lb.ft. (40 7 N m) with tool (D).end by:a) install valve covers
1. Put 5P3931 Anti-Seize Compound on the threads of direct injection adapters (1).2. Put liquid soap on O-ring seal (3) and the adapter bore in the cylinder head. Install O-ring seal (3) on the adapter.3. Install adapter (1) and gasket (2) in the cylinder head. Use tool (A) to tighten the adapter to a torque of 150 10 lb.ft. (205 14 N m). 4. Put a small amount of clean engine oil on the bridge dowels. Install valve bridges (4). 5. Put a small amount of diesel fuel in the direct injection adapter bore. Install fuel injection valves (5) with tool (B). Tighten the nuts that hold the injection valves in place to a torque of 55 5 lb.ft. (75 7 N m). 6. Install push rods (9) with tool (C).7. Put a small amount of diesel fuel on O-ring seal (6) and install fuel line assemblies (8). Tighten fuel line nuts (7) to a torque of 30 5 lb.ft. (40 7 N m) with tool (D).end by:a) install valve covers
Have questions with 140254-4300?
Group cross 140254-4300 ZEXEL
Iseki
140254-4300
9 411 617 477
62156290800
PLATE