106871-0142 ZEXEL 9 400 610 136 BOSCH INJECTION-PUMP ASSEMBLY 9400610136 1068710142 1670097570


 

Information injection-pump assembly

BOSCH 9 400 610 136 9400610136
ZEXEL 106871-0142 1068710142
NISSAN-DIESEL 1670097570 1670097570
106871-0142 INJECTION-PUMP ASSEMBLY
Rating:
13
Buy INJECTION-PUMP ASSEMBLY 106871-0142 zexel genuine, new aftermarket engine parts with delivery

Service parts 106871-0142 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106087-5391
3. GOVERNOR 105306-0780
4. SUPPLY PUMP 105217-1410
5. AUTOM. ADVANCE MECHANIS 105636-0690
6. COUPLING PLATE 105662-0602
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-5840
11. Nozzle and Holder 16600-97019
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105031-4210
14. NOZZLE 105015-5450
15. NOZZLE SET

Include in #1:

106871-0142 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 610 136 9400610136
ZEXEL 106871-0142 1068710142
NISSAN-DIESEL 1670097570 1670097570


Zexel num
Bosch num
Firm num
Name
106871-0142 
106871-0143 
9 400 610 136 
1670097570  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
RE8 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-8-7-5- 4-3-6-2
Pre-stroke mm   3.65 3.6 3.7
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-8
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-5
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-3
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cyl.1-2
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.3
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   107.2 106.2 108.2
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   5.7+-0.5
Pump speed r/min   225 225 225
Average injection quantity mm3/st.   11.3 9.3 13.3
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Timer adjustment
Pump speed r/min   800--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   750
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   900
Advance angle deg.   1.4 0.9 1.9
Timer adjustment_04
Pump speed r/min   1150
Advance angle deg.   5.5 5 6
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106871-0142
N:Pump speed R:Rack position (mm) (1)After completing adjustment of the broken line, set the lever at the unbroken line position. (2)Rack limit using the stop lever: R1 (3)Rack difference from N = N1 (4)Beginning of damper spring operation: DL
----------
R1=10.6+0.2mm N1=700r/min DL=5.7-0.2mm
----------

0000000901

Test data 106871-0142
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=16deg+-5deg b=20deg+-3deg

Stop lever angle

Test data 106871-0142
N:Pump normal S:Stop the pump.
----------

----------
a=12deg+-5deg b=31deg+-5deg

Timing setting

Test data 106871-0142
(1)Pump vertical direction (2)Position of the coupling's key groove at the beginning of injection of the No. 8 cylinder. (3)- (4)-
----------

----------
a=(90deg)




Information:

Installation of Nozzles, Ether Supply Tubes and Connectors
1. If the machine does not already have an ether aid starting system, remove the plugs from turbocharger outlet adapters on the engine. 2. Install a 3B6768 Bushing with a 7X1078 Nozzle Assembly (2) where each plug was removed. If machine was equipped with an ether aid starting system. Discard old nozzles and install new nozzles.3. When installing each nozzle assembly (2), the indicator mark at location (J) must be at the top as shown. Tighten the nozzle to a torque of 2.8 N m (25 lb in).
Top View
Side View DO NOT overtighten tube assembly fittings. Over tightening can cause damage to tubing.4. Install 8X0912 Tube (9) in the front nozzle and 8W8174 Tube (7) in the rear nozzle as shown. Connect tubes (7) and (9) to 8C9006 Tee (8) using two 5P6314 Sleeves and 5P6313 Nuts.5. Put 8W8172 Tube (5) in position along the cylinder block and connect it to 8C9006 Tee (8) as shown using 5P6314 Sleeve and 5P6313 Nut.6. Connect one end of 8W8171 Tube (10) to elbow (11) on the bottom of the shuttle valve using a 5P6313 Nut and 5P6314 Sleeve. Fasten the tube to the frame cross tube using 6V2686 Clip (6) as shown.7. Connect one end of 7N0140 Tube Assembly (4) to the end of 8W8171 Tube (10) and connect the other end to the free end of 8W8172 Tube (5).8. Fasten the ether tubing assemblies, using three 6V2686 Clips (3) with existing bolts, on engine block and right regulator housing as shown.Installation of Ether Cylinders
1. Turn the disconnect switch to the ON position and put the start switch key in the OFF position. Make sure the two lamps on the console and the two yellow LEDs on the ECU are flashing.If they are flashing, it indicates that the control is functioning and recognizes that no ether cylinders are installed.2. Inspect the two digit, seven segment LED display on the ECU. It must read "OO". This in an indication that there are no faults.If the display does not read "OO", refer to the Service Manual for a troubleshooting procedure of the system. 3. Remove protective caps (1) and (3) from 9X7137 Ether Solenoid Valves (2) and (4). Install a new 9X7138 Filter Assembly in each solenoid valve inlet.4. Install a 9X0147 Collar on the neck of each new 7X1062 Ether Cylinder.5. Remove the protective plug from the end of the new FULL ether cylinder, then install the new ether cylinder on ether solenoid valve (2). The ether valve assembly at left location (C) is referred to as Ether Assembly No. 1. The ether valve assembly at right location (D) is referred to as Ether Assembly No. 2.Make sure that the dash mounted ETHER OUT warning lamp No. 1 and the ETHER OUT warning LED on the ECU are OFF. Repeat this procedure for installation of

Have questions with 106871-0142?





Group cross 106871-0142 ZEXEL

Nissan-Diesel 

 
1670097563 
INJECTION-PUMP ASSEMBLY
RE8
106871-0142  

106871-0143 
9 400 610 136 
1670097570 
INJECTION-PUMP ASSEMBLY
RE8
 
 
INJECTION-PUMP ASSEMBLY
RE8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 612 479 
1670097575 
INJECTION-PUMP ASSEMBLY
RE8
Back to top