106861-0690 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1068610690 1670097560


 

Information injection-pump assembly

ZEXEL 106861-0690 1068610690
NISSAN-DIESEL 1670097560 1670097560
106861-0690 INJECTION-PUMP ASSEMBLY
Rating:
71
Buy INJECTION-PUMP ASSEMBLY 106861-0690 zexel genuine, new aftermarket engine parts with delivery

Service parts 106861-0690 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106086-5310
3. GOVERNOR
4. SUPPLY PUMP 105217-1410
5. AUTOM. ADVANCE MECHANIS 105636-0280
6. COUPLING PLATE 105662-0600
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4550
11. Nozzle and Holder 16600-97012
12. Open Pre:MPa(Kqf/cm2) 19.6{200}
13. NOZZLE-HOLDER 105031-4210
14. NOZZLE 105015-4250
15. NOZZLE SET

Include in #1:

106861-0690 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106861-0690 1068610690
NISSAN-DIESEL 1670097560 1670097560


Zexel num
Bosch num
Firm num
Name
106861-0690 
106861-0695 
 
1670097560  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
RD8 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-8-7-5- 4-3-6-2
Pre-stroke mm   3.65 3.6 3.7
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-8
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-5
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-3
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cyl.1-2
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   A
Rack position   11.5
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   109 108 110
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   11.5
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   107 104 110
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   11.5
Pump speed r/min   1200 1200 1200
Average injection quantity mm3/st.   112 108 116
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   D
Rack position   5.6+-0.5
Pump speed r/min   235 235 235
Average injection quantity mm3/st.   18.6 16.6 20.6
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Timer adjustment
Pump speed r/min   600
Advance angle deg.   0.5
Timer adjustment_02
Pump speed r/min   750
Advance angle deg.   1
Timer adjustment_03
Pump speed r/min   1000
Advance angle deg.   1.9 1.4 2.4
Timer adjustment_04
Pump speed r/min   1250+-25
Advance angle deg.   4 3.5 4.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106861-0690
N:Pump speed R:Rack position (mm) (1)After completing adjustment of the broken line, set the lever at the unbroken line position. (2)Beginning of damper spring operation: DL (3)Rack limit using stop lever
----------
DL=5.1-0.5mm
----------

0000000901

Test data 106861-0690
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=13deg+-5deg b=23deg+-3deg

Stop lever angle

Test data 106861-0690
N:Pump normal S:Stop the pump.
----------

----------
a=14deg+-5deg b=32deg+-3deg




Information:


Remove the 345-2985 Ether Nozzles (Atomizers) or the plug in the hole in each intake manifold. Install the more robust 423-4336 Ether Nozzles (Atomizers) and related parts.
Refer to the attached Rework Procedure.
SERVICE CLAIM ALLOWANCES
****Parts Stock****
Submit one claim for all engines reworked in dealer parts stock. The parts listed in the Parts Needed will be allowed for each engine that is reworked. 1 hour labor will be allowed for each engine that is reworked. Include the engine serial numbers and arrangement numbers in the service claim story.
****Affected Product****
Product smu/age whichever comes first Caterpillar Dealer Suggested Customer Suggested
Parts % Labor Hrs% Parts % Labor Hrs% Parts % Labor Hrs%
*******Group 1*******
0-21000 hrs,
0-60 mo 100.0% 100.0% 0.0% 0.0% 0.0% 0.0%
This is a 1.0-hour job for Group 1
Product smu/age whichever comes first Caterpillar Dealer Suggested Customer Suggested
Parts % Labor Hrs% Parts % Labor Hrs% Parts % Labor Hrs%
*******Group 2*******
0-21000 hrs,
0-60 mo 100.0% 100.0% 0.0% 0.0% 0.0% 0.0%
This is a 1.0-hour job for Group 2
PARTS DISPOSITION
****Parts Stock****
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
****Affected Product****
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Rework Procedure
Group Number 1
1. Remove the existing ether nozzles or plugs from the left and right intake manifolds.
2. Install the components identified in Image 1.1.1. Apply thread sealant (Loctite 536) to the threads of the 423-4336 Ether Nozzles before tightening (9 +/- 2 Nm) them into the intake manifolds.
3. Check to ensure that the ether control parameter is programmed to "Enabled" by using Cat ET.
Image1.1.1
Group Number 2
1. Remove the existing ether nozzles or plugs from the left and right intake manifolds.
2. Install the components identified in Image 2.1.1 on the front right side of the engine. Apply thread sealant (Loctite 536) to the threads of the 423-4336 Ether Nozzles before tightening (9 +/- 2 Nm) it into the intake manifold.
Image2.1.1
3. Install the components identified in Image 2.2.1 on the front left side of the engine. Apply thread sealant (Loctite 536) to the threads of the 423-4336 Ether Nozzles before tightening (9 +/- 2 Nm) it into the intake manifold.
4. Check to ensure that the ether control parameter is programmed to "Enabled" by using Cat ET.
Image2.2.1

Have questions with 106861-0690?





Group cross 106861-0690 ZEXEL

Nissan-Diesel 

106861-0690  

106861-0695 
 
1670097560 
INJECTION-PUMP ASSEMBLY
RD8
 
1670097567 
INJECTION-PUMP ASSEMBLY
RD8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 617 949 
1670097610 
INJECTION-PUMP ASSEMBLY
RD8
Back to top