106682-4550 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066824550 0160090020


 

Information injection-pump assembly

ZEXEL 106682-4550 1066824550
SHINKO-ENGIN. 0160090020 0160090020
106682-4550 INJECTION-PUMP ASSEMBLY
Rating:
11
Buy INJECTION-PUMP ASSEMBLY 106682-4550 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 106682-4550 1066824550
SHINKO-ENGIN. 0160090020 0160090020


Zexel num
Bosch num
Firm num
Name
106682-4550 
 
0160090020  SHINKO-ENGIN.
INJECTION-PUMP ASSEMBLY
S613 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8130
Bosch type code   EFEP215A
Nozzle   105780-0050
Bosch type code   DN6TD119NP1T
Nozzle holder   105780-2090
Bosch type code   EFEP215
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-7120
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.5 3.45 3.55
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   12.2
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   244 241 247
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   8.7+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   20 18 22
Max. variation between cylinders %   0 -15 15
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 106682-4550
N:Pump speed R:Rack position (mm) (1)Target notch: K
----------
K=17
----------

Speed control lever angle

Test data 106682-4550
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=(25deg)+-5deg b=(43deg)+-5deg

Stop lever angle

Test data 106682-4550
N:Pump normal S:Stop the pump.
----------

----------
a=19deg+-5deg b=53deg+-5deg

Timing setting

Test data 106682-4550
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(10deg)




Information:

start by:a) remove flywheel housingb) remove valve liftersc) remove pistonsd) remove timing gear cover and oil pump1. Fasten a hoist and put the engine in position on tool (A).2. Turn the crankshaft until the timing mark on the crankshaft gear is in alignment with the timing mark on the camshaft gear. For more detail about removal of main bearings see REMOVE AND INSTALL CRANKSHAFT MAIN BEARINGS. 3. Remove bolts (1) and main bearing caps (2). Remove the lower halves of the main bearings from the caps.4. Install two of the bolts that hold the flywheel in place in the end of crankshaft. 5. Fasten a hoist and remove crankshaft (3) from the engine. The weight of the crankshaft is 54 kg (120 lb.).
Be careful not to cause damage to the crankshaft journals when the crankshaft is removed.
6. Remove the upper halves of the main bearings from the cylinder block.7. Install tooling (B) and remove the gear from the crankshaft. Install Crankshaft And Gear
1. Install the key for the crankshaft gear so it is even with the end of the crankshaft.2. Heat the crankshaft gear to a maximum temperature of 260°C (500°F). Install the gear on the crankshaft with the timing mark on the gear toward the pulley end of the crankshaft.3. Install the thrust bearing for the No. 4 main. Install the bearings dry when the clearance checks are made. Put clean engine oil on the bearings for final assembly.4. Install the upper main bearings (the bearings with oil hole) into the engine block.5. Install two of the bolts that hold the flywheel in place in the end of the crankshaft. Fasten a hoist and put the crankshaft in position in the block. Make sure the timing mark on the crankshaft gear is in alignment with the timing mark on the camshaft gear. For more detail about installation of main bearings see REMOVE AND INSTALL CRANKSHAFT MAIN BEARINGS.
When the bearing caps are installed, make sure the number on the side of the cap is next to and respective with the number on the engine block.
When the bearing clearance is checked and the engine is in a vertical position, the crankshaft will have to be lifted up with a force equal to the weight of the crankshaft and held against the upper halves of the main bearings to get a correct measurement with Plastigage. The Plastigage will not hold the weight of the crankshaft and give a correct indication. If the engine is in a horizontal position, such as on an engine stand, it is not necessary to hold the crankshaft up. Do not turn crankshaft when Plastigage is in position to check clearance. 6. Check the bearing clearance with Plastigage. Put the lower main bearings into the caps. Put the caps in position and install the bolts. Tighten the bolts in number sequence as follows: a) Tighten bolts 1 through 10 to a torque of 40 4 N m (30 3 lb.ft.).
Do not use an impact

Have questions with 106682-4550?





Group cross 106682-4550 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Niigata-Urawa 

 
74W47040A 
INJECTION-PUMP ASSEMBLY
6NSE

Niigata-Tekkou 

9 400 617 558 
74W47040C 
INJECTION-PUMP ASSEMBLY
6NSE
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 559 
6162732121 
INJECTION-PUMP ASSEMBLY
SA6D170
 
6215711170 
INJECTION-PUMP ASSEMBLY
SA12V140
 
 
INJECTION-PUMP ASSEMBLY
SA12V140

Komatsu 

9 400 617 560 
6215711171 
INJECTION-PUMP ASSEMBLY
SA12V140
 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 538 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 561 
6162732150 
INJECTION-PUMP ASSEMBLY
S6D170

Shinko-Engin. 

106682-4550  
 
0160090020 
INJECTION-PUMP ASSEMBLY
S613
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 562 
6162732132 
INJECTION-PUMP ASSEMBLY
SA6D170
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 871 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
SA6D125H
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 563 
6152711380 
INJECTION-PUMP ASSEMBLY
SA6D125H

Yanmar 

 
12862551010 
INJECTION-PUMP ASSEMBLY
6GHA-ST
 
 
INJECTION-PUMP ASSEMBLY

Yanmar 

9 400 617 564 
12862551011 
INJECTION-PUMP ASSEMBLY
6GHA-ST
Back to top